Zum Inhalt springen

AvTalk Episode 391: A critical path faces its greatest challenge yet

16.10.2026 · 1 Std. 5 Min.

Shownotes

On this week’s episode of AvTalk, flights in Saudi Arabia are facing intense disruption following a series of strikes by the Houthi’s on Saudi aviation infrastructure. Riyadh Airport is closed until at least 18 October after a strike on a terminal building killed at least 12 people and injured hundreds more. Airports like Jeddah and Dammam have also faced disruptions and airports in the southwest of the country have been closed this week.

Elsewhere, Israel is banning airline crews from a long list of countries from flying to/from Israel, leaving some airlines in the lurch.

Retirement flights

Austrian airlines is preparing to retire its 767 fleet at the end of next month. The airline has operated the type across five decades and this week we’re joined this week by two people who know the aircraft better than most. Pilot Christian Flatschart and Purser Thomas Lechner share their stories from their time on the 767. Join the farewell journey in the airline’s official WhatsApp group and join the final fan flight on 1 December.

And this weekend, Lufthansa will operate its final A340-600 flight. LH419 from Washington-Dulles to Frankfurt will depart on 18 October. We’ll have full report from onboard next week.

 

Click here for a transcript of this week’s episode.

The post AvTalk Episode 391: A critical path faces its greatest challenge yet appeared first on Flightradar24 Blog.

Alle Folgen von AvTalk – Aviation Podcast

Einstellungen

Darstellung

Sprache

Bestimmt, welche Sender dir auf der Startseite zuerst gezeigt werden.

Verlauf

Zuletzt gehörte Sender und Folgen und deine letzten Suchen liegen nur in diesem Browser.

Hinweise

Ein kurzer Hinweis, wenn ein Podcast, dem du folgst, eine neue Folge hat. Einzelne Podcasts stellst du über die Glocke auf ihrer Seite ab.

Konto

Favoriten speichern – in der App und auf der Website.

Tastenkürzel

/
Suche öffnen
Leertaste
Abspielen oder anhalten
← →
Im Player: 15 s zurück, 30 s vor (Folgen) · im Regal: nächste Kachel
↑ ↓
Im Regal: Ziel innerhalb der Kachel
Pos1 / Ende
Im Regal: erste bzw. letzte Kachel
Esc
Fenster oder Menü schließen
?
Diese Übersicht
Läuft gerade

Zur Senderseite

Als Nächstes

    Folgen mit „Als Nächstes“ vormerken – sie laufen nach der aktuellen Folge.