Zum Inhalt springen

North-South Corridor delay: Was it avoidable – and can businesses survive the impact?

22.09.2026 · 24 Min.

Shownotes

Another delay to the construction of the North-South Corridor means two more years of dust, noise and disruption for affected residents, businesses and pedestrians. For an engineering project of this scale and complexity, are delays simply part of the process or could more have been done to prevent them? And as businesses grapple with declining footfall and mounting losses, what can be done to help them ride out the prolonged disruption? In this week’s Deep Dive, Steven Chia speaks with Dr David Ng from The Institution of Engineers, Singapore - who has worked on major infrastructure projects from the Kallang-Paya Lebar Expressway (KPE) to MRT lines - and business owner Alvin Lin about the challenges surrounding the Corridor project, from the engineering difficulties to the business fallouts.

See omnystudio.com/listener for privacy information.

Alle Folgen von Deep Dive

Einstellungen

Darstellung

Sprache

Bestimmt, welche Sender dir auf der Startseite zuerst gezeigt werden.

Verlauf

Zuletzt gehörte Sender und Folgen und deine letzten Suchen liegen nur in diesem Browser.

Hinweise

Ein kurzer Hinweis, wenn ein Podcast, dem du folgst, eine neue Folge hat. Einzelne Podcasts stellst du über die Glocke auf ihrer Seite ab.

Konto

Favoriten speichern – in der App und auf der Website.

Tastenkürzel

/
Suche öffnen
Leertaste
Abspielen oder anhalten
← →
Im Player: 15 s zurück, 30 s vor (Folgen) · im Regal: nächste Kachel
↑ ↓
Im Regal: Ziel innerhalb der Kachel
Pos1 / Ende
Im Regal: erste bzw. letzte Kachel
Esc
Fenster oder Menü schließen
?
Diese Übersicht
Läuft gerade

Zur Senderseite

Als Nächstes

    Folgen mit „Als Nächstes“ vormerken – sie laufen nach der aktuellen Folge.