How to create a building budget for your project
Shownotes
“It’s monopoly money at that point.” This week it’s just the two of us, talking about the preliminary budget: the first real number you get on your build, and why it’s not the final price.
What plans do we need before we can price it? How much should you spend on consultants at this stage? And why do we both say this is the most important stage of the whole process?
We also get into what we ask the trades, where the budget tends to blow out (hello, power points), and how long it all takes. We go about it a bit differently, so there’s a bit of a debate.
What happens when the number is higher than you hoped? And how much can you really save? If you’re building, or thinking about it, this one’s for you.
CHAPTER MARKERS
00:00 Introduction
01:34 What Is A Preliminary Budget
02:25 Plans And Engineering You Need
05:06 Keep Consultant Costs Low
07:15 The Four Stage Pricing Process
10:45 Getting Trade Quotes Early
13:49 Electrical Death By A Thousand Cuts
14:43 Bill Of Quantities At Budget Stage
18:51 How Long It Takes
19:48 RFIs And Items For Consideration
24:08 Fix Problems Before Site
27:26 Presenting The Number To The Client
31:15 Budget Creep And Rising Costs
36:11 Value Management Limits
38:35 Feasibility Is A Range, Budget Is A Number
Our Sponsors:
Pro Clima: https://mindful-builder.captivate.fm/proclima
Wunderbuild: https://www.wunderbuild.com/
Biz Tech Guru: https://www.biztechguru.com.au/
Connect with us on Instagram: @themindfulbuilderpod
Connect with Hamish:
Instagram: @sanctumhomes
Website: https://www.yoursanctum.com.au/
Connect with Matt:
Instagram: @carlandconstructions