Skip to content

Koryx Copper in Final Stages of its Haib PFS

November 13, 2026 · 11 min

Show notes

Koryx Copper CEO Heye Daun joins Trevor Hall at the Precious Metals Summit in Zurich to discuss the upcoming pre-feasibility study for the Haib Copper Project in Namibia. Daun outlines the significant improvements achieved over the past year, including resource expansion, conversion of inferred resources to indicated, reduced stripping ratios, and processing optimizations designed to increase throughput and copper-equivalent feed grades. The conversation explores the potential for annual copper production exceeding 100,000 tonnes, anticipated competitive operating costs, and the decision to simplify the project's flowsheet by removing oxide heap leaching.

All episodes of Mining Stock Daily

Settings

Display

Language

Decides which stations you see first on the home page.

History

Recently played stations and episodes and your latest searches are only stored in this browser.

Notifications

A short notice when a podcast you follow has a new episode. Turn off single podcasts with the bell on their page.

Account

Save favorites – in the app and on the website.

Keyboard shortcuts

/
Open search
Space
Play or pause
← →
In the player: back 15 s, forward 30 s (episodes) · in a row: next tile
↑ ↓
In a row: target within the tile
Home / End
In a row: first or last tile
Esc
Close window or menu
?
This overview
Now playing

Go to station page

Play next

    Add episodes with “Play next” – they play after the current episode.