140 UK Data Centres Are Queuing for Power That Doesn't Exist. Here's Where the Money Goes.

July 31, 2026 · 12 min

Show notes

The UK has announced $59 billion of data centre investment since 2023, and the National Grid cannot power it. 140 data centres are sitting in the connection queue asking for 50GW; the UK's peak demand this year was 45GW. In this episode of Noise Cancelling, Jon explains how the grid connection queue actually works, and Neil Woodford explains why he believes this is an energy policy failure decades in the making.

We cover the three things that make the queue unfixable on current policy: connection waits stretching past 2035, why no large gas plant has been built since 2016, and why industrial electricity in the UK costs four times what it does in the US. OpenAI has already put its UK Stargate project on hold.

Then the investor question: if announced capacity is not delivered capacity, where does the capital actually have to go first? Transmission, grid supply chains, nuclear including SMRs, and gas peaking. Watch the queue, watch Ofgem reform, and watch which hyperscale campuses actually break ground.

All episodes of Noise Cancelling with Neil Woodford

Settings

Display

Language

Decides which stations you see first on the home page.

History

Recently played stations and episodes and your latest searches are only stored in this browser.

Notifications

A short notice when a podcast you follow has a new episode. Turn off single podcasts with the bell on their page.

Account

Save favorites – in the app and on the website.

Keyboard shortcuts

/
Open search
Space
Play or pause
← →
In the player: back 15 s, forward 30 s (episodes) · in a row: next tile
↑ ↓
In a row: target within the tile
Home / End
In a row: first or last tile
Esc
Close window or menu
?
This overview
Now playing

Go to station page

Play next

    Add episodes with “Play next” – they play after the current episode.