Shane Williams, President and CEO Of West Red Lake Gold Mines (TSX.V:WRLG – OTCQB:WRLGF), joins me to review the key metrics from Q3 production and operations, as well as the key takeaways from the updated Pre-Feasibility Study (PFS) released November 4th. We also look ahead to development and exploration work on tap for Q4 into 2027, and the bigger picture vision for future growth.

Q3 Operating Highlights

  • Gold production totaled 7,859 ounces during Q3 2026 bringing year-to-date production to 22,102 ounces. September was the strongest month since the restart of the Madsen Mine, with 3,320 ounces produced.
  • Mined tonnage totaled 63,945 tonnes in Q3 2026, while mined ounces totaled 7,689 ounces.
  • Underground development continued to expand production inventory and advance access to additional mining areas, increasing the number of available mining fronts and building greater flexibility into the mine plan for 2027 and beyond.
  • A secondary crusher was installed and commissioned during Q3. The crusher is now operational, supporting the mill’s ability to process up to 1,000 tonnes per day (“tpd”). The low grade surface stockpile generated in second quarter was processed during Q3.
  • The mill achieved average processing rates of approximately 867 tpd during Q3.

Integrated PFS Highlights

  • At a long-term gold price of USD $3,568 per ounce, the Integrated PFS generates an after-tax Net Present Value (“NPV”) of $764 million (“M”), and cumulative after-tax free cash flow of over $1 billion (“B”). At a 10% higher gold price of US$4,161 per ounce (10% above the LOM average gold price of US$3,782 per ounce), the after-tax NPV increases 31% to $1.0 B, highlighting the significant leverage to higher gold prices.
  • Average annual gold production of 88 Koz over a 10-year mine life, including average annual production of 108 Koz from 2029 through 2034 and peak annual production of 119 Koz. The LOM plan outlines approximately 884 Koz of total recovered gold production, supported by combined Mineral Reserves of 4.41 million tonnes grading 6.8 grams per tonne (“g/t”) gold (“Au”), representing an 85% increase in contained reserve ounces compared to the 2025 PFS.
  • LOM average cash costs of US$1,795 per ounce and all-in sustaining costs (“AISC”) of US$2,457 per ounce, supported by a combined average diluted head grade of 6.8 g/t Au, including 6 g/t Au from Madsen and 9 g/t Au from Rowan.
  • A combined mine plan built around the operating Madsen Mine and mill, with Rowan and Fork providing additional sources of high-grade, non-remnant feed and increasing production flexibility.
  • $200 million of growth capital to develop the Rowan project, expand the Madsen mill and tailings management facility, leveraging existing road, power and site infrastructure to support the integrated operation.
  • Further growth opportunities: The Integrated PFS mine plan does not include resources from the Wedge, Russet or Mount Jamie deposits, or consideration from the past producing Starratt-Olsen mine which is still pre-resource stage. It also does not include the potential opportunity to extend both the Madsen and Rowan deposits at depth. These areas provide opportunities to extend mine life, increase production and improve operating flexibility through future drilling, engineering and permitting.

If you have any follow up questions for Shane or the team over at West Red Lake Gold please email me at [email protected].

  • In full disclosure, Shad is a shareholder of West Red Lake Gold Mines at the time of this recording and may choose to buy or sell shares at any time.

Click here to follow the latest news from West Red Lake Gold

For more market commentary & interview summaries, subscribe to our Substack reports:

The KE Report: https://kereport.substack.com/

Shad’s resource market commentary: https://excelsiorprosperity.substack.com/

Investment disclaimer:

This content is for informational and educational purposes only and does not constitute investment advice, an offer, or a solicitation to buy or sell any security. Investing in equities and commodities involves risk, including the possible loss of principal. Do your own research and consult a licensed financial advisor before making any investment decisions. Guests and hosts may own shares in companies mentioned.

All episodes of The KE Report

Settings

Display

Language

Decides which stations you see first on the home page.

History

Recently played stations and episodes and your latest searches are only stored in this browser.

Notifications

A short notice when a podcast you follow has a new episode. Turn off single podcasts with the bell on their page.

Account

Save favorites – in the app and on the website.

Keyboard shortcuts

/
Open search
Space
Play or pause
← →
In the player: back 15 s, forward 30 s (episodes) · in a row: next tile
↑ ↓
In a row: target within the tile
Home / End
In a row: first or last tile
Esc
Close window or menu
?
This overview
Now playing

Go to station page

Play next

    Add episodes with “Play next” – they play after the current episode.